Phoenix

Launched 2007

In brief: Phoenix investigated the soil near Mars's north pole and the movement of water through its cold air. NASA's lander dug into the ground while a Canadian meteorological station measured the weather overhead. Launched on August 4, 2007, Phoenix landed on May 25, 2008, and worked for more than five months. Its instruments verified subsurface water ice; the Canadian laser instrument detected snow falling from clouds above the landing site. The last signal arrived on November 2, 2008, as dwindling sunlight left the lander short of power. CSA mission account; NASA/JPL mission closeout

Mission and participants

The University of Arizona led the NASA mission, with project management at NASA's Jet Propulsion Laboratory and development by Lockheed Martin. Its robotic arm gathered soil for onboard analysis. The Canadian Space Agency (CSA) supplied the meteorological station, or MET, for temperature, pressure and atmospheric observations. MDA Space Missions was the prime contractor for MET; Toronto-based Optech provided the lidar, a laser that sends light pulses into the air and measures their return from cloud and dust layers. York University led Canadian science. The wind sensor came from Aarhus University in Denmark and the pressure sensor from the Finnish Meteorological Institute. NASA/JPL mission closeout; CSA mission account; CSA MET announcement

MET began taking readings within hours of landing. Its lidar observed clouds, fog and dust and detected snow descending from clouds roughly four kilometres above Phoenix. The lander's other instruments exposed water ice beneath the soil and found perchlorate and calcium carbonate. These observations helped investigate whether the polar environment had ever been suitable for life; they did not establish that life existed there. CSA mission account; NASA/JPL mission closeout

How the pieces fit

flowchart TB
    CSA["Canadian Space Agency"] -->|"funded MET through MDA [2, 3]"| MDA["MDA Space Missions"]
    OP["Optech"] -->|"provided lidar expertise [2]"| MDA
    MDA -->|"prime contractor for [2, 3]"| MET["MET weather station"]
    YORK["York University team"] -->|"led Canadian science [2]"| MET
    MET -->|"flew aboard [1]"| PHX["Phoenix lander"]
    MET -->|"measured weather and snow [1]"| WEATHER["Mars weather record"]
    click CSA "https://www.asc-csa.gc.ca/eng/astronomy/mars/phoenix/" "Canadian Space Agency account"
    click PHX "https://www.jpl.nasa.gov/news/mars-phoenix-lander-finishes-successful-work-on-red-planet/" "NASA/JPL Phoenix closeout"

The CSA's 2005 announcement names MDA Space Missions as the MET prime contractor and Optech as its lidar subcontractor, and names the York University team as Canadian science lead; York's earlier report records the first $13.5 million award. The CSA's completed-mission account places MET on the Phoenix deck and reports its measurements of Martian temperature, pressure and snow during the 2008 surface mission; NASA/JPL credits the lander's separate soil instruments with the water-ice finding.

Funding and scope

In July 2005 the CSA awarded MDA $13.5 million to continue MET development. On October 27, the CSA announced a final $6 million contribution to MDA and described its support for MET design and construction as $19.5 million in total. The latter figure includes the final contribution; it is not a third award. The release does not state the currency explicitly. Optech was MDA's subcontractor, not the named recipient of the whole station amount. These figures cover the Canadian weather station, not the cost of NASA's Phoenix lander. York University award report; CSA MET announcement

How the mission unfolded

From instrument to Mars · 2005–2008

  1. 2005July 28: York University reports the CSA's $13.5 million award to MDA for MET development [3].
  2. 2005October 27: CSA announces a final $6 million contribution and a $19.5 million MET total [2].
  3. 2007August 4: Phoenix launches toward Mars [1, 4].
  4. 2008May 25: Phoenix lands near the northern polar cap; MET begins weather observations [1, 4].
  5. 2008November 2: engineers receive the last signal before the seasonal loss of power ends the surface mission [4].

Phoenix outlasted its three-month design life; analysis continued after the lander fell silent. CSA mission account; NASA/JPL mission closeout