STS-97
Launched 2000
In brief
The first crew living aboard the International Space Station (ISS) needed more electrical power as the outpost grew. NASA sent the P6 truss, bearing the station's first pair of U.S. solar arrays, aboard space shuttle Endeavour on November 30, 2000. Canadian Space Agency (CSA) astronaut Marc Garneau operated the shuttle's Canadarm to lift the assembly from its cargo bay and place it on the station. American astronauts secured the truss during a spacewalk on December 3; another spacewalk completed electrical connections on December 5. The arrays gave the growing station new power, and Endeavour returned to Earth on December 11. [1][2][3][4]
Mission and participants
STS-97 was NASA's ISS assembly flight 4A, flown by Endeavour with five astronauts. Its main cargo, P6, combined solar arrays with the electrical equipment needed to collect, store and distribute their power. NASA supplied and operated the shuttle flight and station assembly work. Garneau, a CSA astronaut serving as mission specialist and flight engineer, made his third trip into orbit. Canada's contribution to this NASA flight was his work with the Canadian-built shuttle Canadarm and its Space Vision System, which helped him position the truss. [1][2][3]
From inside Endeavour, Garneau lifted P6 out of the payload bay on December 2 and held it overnight so sunlight could warm its components. On December 3 he guided it onto the station's Z1 truss while NASA astronauts Joseph Tanner and Carlos Noriega gave visual cues outside, fastened the assembly and made its first connections. Commander Brent Jett commanded the two arrays to unfold. The first initially stuck, then opened; the second also deployed. Tanner and Noriega completed further wiring on December 5 so the new arrays could supply the U.S. station segment. [1][2][3]
How did the new power assembly reach the station?
flowchart LR
Garneau["Garneau inside Endeavour"] -->|"operated [1]"| Arm["Shuttle Canadarm"]
Arm -->|"positioned P6 on [3]"| Z1["ISS Z1 truss"]
Spacewalkers["Tanner and Noriega"] -->|"secured and wired P6 [3]"| Z1
P6["P6 solar arrays"] -->|"supplied power to [3]"| Segment["U.S. station segment"]
On December 2–3, 2000, Canadian Space Agency astronaut Marc Garneau operated Endeavour's shuttle Canadarm to lift P6 and position it on the ISS's Z1 truss; NASA astronauts Joseph Tanner and Carlos Noriega secured it during the December 3 spacewalk and completed the U.S. segment's electrical hookups on December 5. CSA's mission account identifies Garneau's arm and Space Vision System work; NASA's completed-flight account records the placement, two installation spacewalks and power connections. [1][3]
How the mission unfolded
Power for an inhabited station · November–December 2000
- 2000November 30: *Endeavour* launches with the P6 solar-array truss and a five-person crew including Garneau [1][2][3]
- 2000December 2: *Endeavour* docks with the inhabited ISS; Garneau lifts P6 into an overnight holding position with the shuttle arm [2][3]
- 2000December 3: Garneau places P6 on Z1; Tanner and Noriega fasten and connect it during the first spacewalk, and both solar arrays unfold [3][4]
- 2000December 5: the second spacewalk completes electrical connections for power to the U.S. segment [3]
- 2000December 7: a third spacewalk adjusts the arrays and deploys an experiment to measure electrical conditions around the station [2][3]
- 2000December 8–9: shuttle and station crews meet and transfer supplies; *Endeavour* undocks on December 9 [2][3]
- 2000December 11: *Endeavour* lands at Kennedy Space Center [1][2][3]
The truss arrived while Expedition 1 was already living aboard the ISS. The shuttle and station crews kept a hatch closed until the outside assembly work was done. On December 8 they met inside the station and moved supplies, equipment and refuse between the two craft. [2][3]
What changed
P6 remained on the ISS when the shuttle departed. Its new solar arrays increased the power available to the growing station, an enabling step for later expansion and research. NASA records that the truss was moved from its first position in October 2007 as station assembly continued. [3][4]
Find the mission
- CSA's STS-97 account and Marc Garneau's role
- NASA's STS-97 flight record
- NASA's completed-event account of P6 installation
- NASA's station truss overview
Sources
- [1] Canadian Space Agency, “Mission STS-97” — modified September 4, 2024; Garneau's third flight, shuttle Canadarm and Space Vision System work, launch and landing dates, and P6 as the mission payload. Its short account describes two installation spacewalks; NASA's fuller completed-event record documents a third spacewalk for subsequent tasks.
- [2] NASA, “STS-97” — publication date not shown; assembly-flight designation, crew and roles, launch and landing, three spacewalks, Garneau's arm operation, December 8 crew meeting and December 9 undocking.
- [3] NASA, John Uri, “Space Station 20th: STS-97 Brings Power to the International Space Station” — published December 2, 2020, updated August 21, 2024; completed-event account of docking, arm lift, December 3 attachment and array deployment, December 5 and 7 spacewalks, crew meeting and landing.
- [4] NASA, “Integrated Truss Structure” — publication date not shown; distinguishes the earlier Z1 installation from P6's December 3, 2000 installation and notes P6's October 30, 2007 relocation.
Sources checked: